Search all schedules for one control
.
Accounting > Reports > Schedule Reports > Schedule Detail
- Select the Report Parameters, including:
- Schedule List = All
- Enter Control(s) = The one control number you want.
2, Click the [Run Report] button.
HS 1356079369